This test is to assess your knowledge on Project Quality Framework.
You can take this test only ONCE
Full mark in this test earns you 2% out of the100% for this course
Pass mark for this test is 60%. if you score less, contact the admin for a retest.
0 of 10 Questions completed
Questions:
You must fill out this field. |
|
You must fill out this field. |
|
You must fill out this field. |
|
You must fill out this field. |
You have already completed the test before. Hence you can not start it again.
Test is loading…
You must sign in or sign up to start the test.
You must first complete the following:
0 of 10 Questions answered correctly
Your time:
Time has elapsed
You have reached 0 of 0 point(s), (0)
Earned Point(s): 0 of 0, (0)
0 Essay(s) Pending (Possible Point(s): 0)
Average score |
|
Your score |
|
A software team tracing the root cause of an application failure can use this to help determine the cause(s) of the failure:
What is a control chart?
Which of the following tools can enhance the visibility of traditional written project plans and other documents to provide a real-time overview of the project status?
The technique of comparing actual or planned project practices to those of other projects to generate ideas for improvement and to provide a basis by which to measure performance is known as:
There is a serious defect in the finished product of a project that was completed a few months ago, resulting in a recall campaign to recall the defective products. What would be the best classification for these types of costs?
An effective quality audit should be:
What is the process of random selection and inspection of a work product?
A control chart should always contain:
You have a contract to build a manufacturing plant in Kuala Lumpur. However, you are not familiar with the building codes in Kuala Lumpur or Malaysia, so you are reviewing all their building codes prior to “turning a
shovelful of earth.” This is an example of:
An automotive designer uses a certain technique to determine which combination of suspension and tires will produce the most desirable ride characteristics at a reasonable cost. To do this, the designer employs a statistical framework and systematically changes all the important parameters instead of changing the factors one at a time. This method is known as: